2017 – WUR’s year in review

With the books now closed on 2017, let’s take a moment to reflect on another year in the life of WalkUP Roslindale, your neighborhood walk-bike-transit-Y/QIMBY (Yes/Quality in My Backyard) citizens group. In the opinion of your humble correspondent, below are the top 7 highlights of the year just concluded. Comments, corrections, and additions are always welcome!

  1. Washington Street Operational Bus Improvements Pilot – It came late in the year (and on just 2 Tuesday mornings in December). But the first test of a bus-only lane (shared with people on bikes as well) on Washington Street from Roslindale Square to Ukraine Way from 7 am to 9 am was a widely-hailed successful proof of concept. Bus riders saved significant time, people riding bikes in the corridor generally approved of the shared lane, and the Boston Transportation Department and the MBTA showed they could work quite well together on the first such test case in an outlying neighborhood. It is hard to overstate how big a deal this is — there are several corridors around Boston that desperately need the kind of low-upfront-capital but meaningful time-saving improvements to bus service that was demonstrated for the first time in this city here in Roslindale. A full 2-week pilot is reportedly planned for the spring. Dates and specifics are still TBD. WalkUP Roslindale will do everything it can to support the full pilot and ultimately implementation of a permanent set of improvements. We appreciate the advocacy and support of the proposal from City Councilors Wu and McCarthy as well as BTD’s strong performance on the 2 days of the operational pilot. Special thanks are also owed to LivableStreets Alliance for their persistent advocacy, particularly their Street Ambassadors, who teamed with certain WUR diehards (Messrs. Tedrow, Gag, and Tobin come to mind) on outreach this fall and then during the operational pilot.
  2. Mt. Hope-Canterbury gets Roslindale’s nod for the Neighborhood Slow Streets Program – A grand total of 47 applications were submitted to BTD’s program to install new neighborhood slow streets areas around Boston. Five applicants were picked, and our own Mt. Hope-Canterbury area in eastern Roslindale made the cut. We look forward to seeing the work of MHC stalwarts Lisa Beatman and Rick Yoder and their neighbors in that part of our neighborhood come to fruition in their new NSS by year-end. And herewith our periodic reminder that everyone in Boston deserves to live on a safe street. Everyone on every street in every neighborhood.
  3. Roslindale’s First Street Mural – Our neighborhood’s first street mural was laid down in June at the intersection of Conway and South streets, on the Peters Hill side of the MBTA commuter rail station. This was a great community building event and collaboration with the Mayor’s Mural Crew staff (especially Heidi Schork), BTD, Roslindale Village Main Street, Cornell Coley (Roslindale’s Artist-in-Residence), and our own Rachele Rosi-Kessel, Rebecca Phillips, Mandana Moshtaghi, and Ann-Marie Lawlor.
  4. At-Large City Councilors and Candidates Forum on Active Mobility Issues – WUR was significantly gratified to pull together a forum featuring all 8 current councilors and candidates in October to discuss active mobility issues affecting Roslindale and the city at large. Attendance was strong and we were able to livestream the forum as it was progressing. Particular thanks are due for this event to the Roslindale Community Center for making their downstairs meeting room available for an extended period on the evening of the forum.
  5. Green Shoots Pedestrian Improvements in Roslindale Square – WUR’s late 2015 collaboration with WalkBoston on a walk audit of Roslindale Square finally bore fruit in the spring of this year when key improvements were made to the Basile/Washington crosswalk (including fix the blinking yellow light, installing a handicapped accessible ramp and daylighting with flexposts) and Belgrade/South (including no parking in the area between the crosswalks and daylighting with flexposts). In addition to these major changes, we also saw a new crosswalk near the Robert Street underpass for the MBTA and a new crosswalk center delineator on Belgrade near Robert/Corinth. We hope to see more improvements around the square in the coming year.
  6. Roslindale Gateway Path continues to make progress and draws major foundation support – The early spring saw the release of the 10% design for the Roslindale Gateway Path at a community meeting at the Arnold Arboretum’s Weld Hill research facility, followed a couple of months later by an announcement of formal collaboration with the Arboretum Park Conservancy on a combined Roslindale Gateway/Blackwell Path project. The combined path effort then had the good fortune, with support from LivableStreets Alliance, the Arboretum and BTD, to obtain funding from the Solomon Foundation for advancing the design to the 25% level. Look for the release of the 25% design at some point this spring.
  7. Smarter residential development continues across the neighborhood – Last, but not least, WUR advanced our Y/QIMBY agenda in support of residential development that we thought worthwhile, especially 874-878 South Street (around the corner from your correspondent’s house), 32 Cummins Highway (down the block from the post office), and 4281 Washington Street (the Brayton’s Upholstery building). Our city is growing and need to welcome new residents by building new units form them instead of making them compete with existing residents over existing units.