A message from WalkUP Roslindale about COVID-19 and Roslindale Cares – One way to help our neighbors in these difficult times

Like pretty much everyone these days, WalkUP Roslindale has been preoccupied over the last couple of weeks with responding to the Coronavirus/COVID-19 pandemic sweeping our city, commonwealth, and country. As we pull together and do what must be done to protect our families, friends, and neighbors, we have effectively put our ongoing advocacy initiatives on hold. For now, this is as it should be. As we continue to move forward, a couple of items to consider:

  • City of Boston Coronavirus/COVID-19 Information Summary: Some of us joined a 1000-volunteer city-wide information flyer drop to every household in the neighborhood. Joe Coppinger at the Mayor’s Office posted on twitter about the effort. The flyer was in several common-in-Boston languages in addition to English. Here’s an image of the English-language version:

  • Roslindale Cares: We have also tried to be on the lookout for organized assistance efforts that we and our fellow Rozzidents with the availability and willingness can join. We’re happy to see that Roslindale Cares – our neighobrhood’s mutual aid network – has launched. Go to the website, check them out, and see what works for you to help out our neighbors.

WalkUP Roslindale/West Rox Walks Comments to DCR on Centre Street/Walter Street Intersection

WalkUP Roslindale teamed up with West Rox Walks to offer comments on proposed safety improvements for the Centre Street/Walter Street intersection near the Arnold Arboretum and Sophia Snow Place. This is consistently the most dangerous stretch of road in our neighborhoods and is currently an unpleasant and risky experience for pedestrians, cyclists, and motorists alike. As this road is maintained by the Commonwealth, the Department of Conservation and Recreation (“DCR”) is handling the redesign and taking comments. In its most recent presentation, DCR offered three alternatives for the intersection. Only one of those options (“Alternative 1”) is acceptable in our view; and that design could still benefit from several modifications as detailed below. The deadline for comments is today (Thursday 3/5/20), so if you’d like to add your voice, please submit a brief note on the DCR comment website.

Full letter below. (PDF version also available). You can also check out DCR’s February 13, 2020 PowerPoint presentation about these various options.

Read More

Spring 2020 Gateway Path Update – New 25% Conceptual Plan, Demolition Started at Bussey Brook Meadow

The Roslindale Gateway Path remains one of WalkUP Roslindale’s signature initiatives and a top priority. As we approach the five year mark since its conception (along with WalkUP itself), we’re starting to see concrete progress. Please excuse the pun.

Notably, we recently received a revised 25% conceptual plan for the path from our partner consultant, Horsley Witten Group. As you will see below, the path course has been modestly revised, and more details about eventual construction filled in. Click on the image to see an (extremely) high-resolution detailed version.

Updated 25% Design Plan for Roslindale Gateway PathMeanwhile, demolition work on the new Bussey Brook Meadow entrance to the path–at the end of Arboretum Road off of Washington Street–recently started:

Demolition of Bussey Brook Meadow Entrance to Arboretum

We are looking ahead to break ground for this segment of the path sometime this summer. The other major update is that design work is moving forward on the grand boardwalk connecting the Peters Hill segment of the path – this segment will connect the intersection of Bussey and South Street to the Bussey Brook Meadow. Renderings of this section are expected in June 2020. Blow-up of this section below, with the new, improved Arboretum Road entrance on the bottom right:Boardwalk Section of Bussey Brook Path

WalkUP Roslindale Comment Letter on 3992-3996 Washington Street

3992-3996 Washington Street Rendering
3992-3996 Washington Street Rendering

This week, we sent a comment letter on a proposed 18-unit housing development at 3992-3996 Washington Street, about halfway between Roslindale Square and Forest Hills at the intersection of Archdale Road near Guira y Tambora. While we are always happy to welcome new housing to the neighborhood to help mitigate the region-wide housing crisis, the proposed development suffers from similar shortcomings of many other recent proposals — too much valuable land dedicated permanently to car storage, insufficient commitment to affordability and needed density, and only minimally compliant green-building efforts. We still support the overall project, but hope that the City and developers will not miss this opportunity to build for the 21st century, rather than the 20th. Immediate and major change in how we plan land use and transportation decisions are critical to achieving the vision set out in GoBoston 2030 and the greater Imagine Boston 2030 plan.

Our detailed comments below (PDF version also available).

Read More

Hyde Park Ave Open House – this Tuesday, February 11, 2020, at 7pm at the Hyde Park Police Station

Speak up for safety and transit improvements for Hyde Park Ave! The City of Boston is holding an open house next week to gather feedback about conditions on Hyde Park Ave between Forest Hills Station and Wolcott Square. Please spread the word.

Can you speak up about the need for safety improvements for people walking and biking and dedicated bus lanes?

Hyde Park Ave Open House
Tuesday, February 11, 7:00 pm
@ Hyde Park Police Station
1249 Hyde Park Ave, Hyde Park, MA 02136

Hyde Park Ave is the crucial link between Roslindale and Hyde Park. This road serves several bus routes and over 10,000 bus riders every weekday. Crashes involving people walking, biking, and driving happen regularly along this corridor, and a stretch of it is on the City of Boston’s Vision Zero High Crash Network map. If you support a Hyde Park Ave that improves bus service and is safer for all, please let the City of Boston know!

Not able to attend the open house? BTD has launched a survey to collect feedback.

Thanks to our friends at Livable Streets for the event announcement.

City-sponsored Open House on Roslindale Transportation and Housing – TOMORROW – 30 January 2020 – 6 to 8 pm – Roslindale Substation

We urge everyone who is able to make it to attend tomorrow night’s city-sponsored open house to learn more and share ideas about both transportation and housing issues in our neighborhood. Here’s the listing from the Department of Neighborhood Development’s webpage:

Latest Update

Join the City of Boston (Department of Neighborhood Development, Boston Transportation Department, Boston Planning & Development Agency and Mayor’s Office of Neighborhood Services) at an Open House community meeting for a conversation about how housing and transportation can work together in Roslindale.  This open house will explore the questions, concerns and ideas raised during a September 2019 community meeting regarding Housing with Public Assets at the Roslindale Municipal Parking Lot.

This open house will provide an opportunity to have smaller group discussions with residents, business owners and representatives from city departments responsible for housing production, transportation and neighborhood planning.

Date: Thursday, January 30, 2020
Time: 6:00 PM to 8:00 PM
Location: Roslindale Substation
Address: 4228 Washington Street, Roslindale, MA 02131

ALERT LEVEL BACK DOWN TO CLEAR: Snowfall total is well under 4″ (10cm), so no calling out forces

WalkUP Roslindale Snow Clearance Collaborative 3.3 enthusiasts and devotees are still welcome and encouraged to help out their neighbors and please post any pictures of cleared areas to our facebook account or tweet them out and tag @walkuprozzie when you do, but we won’t have an official effort this time around. When you’re done shoveling, we encourage you to enjoy some French Toast or other hearty breakfast of your choice. It sure is pretty out there!