Centre and Walter Intersection

Official WalkUP Roslindale Comment Letter – Centre Street Corridor Study

Centre and Walter Intersection
Intersection of Centre and Walter Streets

We sent our third WalkUP comment letter today, providing feedback on the Department of Conservation and Recreation’s Centre Street Corridor Study, focusing specifically on the intersection of Centre and Walter Streets, quite likely the most crash-prone intersection in all of Roslindale. We hope DCR will consider our comments seriously and ensure improvements to this area benefit users of all modes of transportation. In addition, because the redesign and construction are likely years away, we emphasize the need to make common-sense easy improvements today, such as flexi-poles and  lane-narrowing, which will save lives and prevent serious injuries while we are waiting for the longer process to complete.

The comment period is open until November 30, 2015. Please add your voice (select “Improved Multi-Modal Safety and Access to Emerald Necklace Parks in Jamaica Plain (Centre Street)” from the drop-down list)!

The content of our letter is reproduced below.

Read More

Bussey and Walter Intersection

Walter and Bussey Intersection Slated for Redesign – Let’s Make It Better!

Bussey and Walter Intersection
Bussey and Walter Intersection

We recently learned that the city plans to rebuild the intersection of Walter and Bussey Street, a problematic spot for pedestrians and bicyclists at the edge of the Arnold Arboretum adjacent the Hebrew Rehabilitation Center and not far from the Sophia Snow House on Centre Street. Although the new design represents an improvement, it is a long way from achieving Complete Streets standards and moving us toward Vision Zero: that no one should die or be seriously injured from transportation on our public ways. We are also troubled by the apparent lack of public notice and comment on a project like this that has significant impacts on our quality of life and would benefit from community input.

New Proposed Design for Walter-Bussey Intersection
New Proposed Design for Walter-Bussey Intersection

Fortunately, our close allies from the Livable Streets Alliance have sent a detailed letter to the City’s new Chief of Streets, Chris Osgood, detailing problems with the new design. Rather than reinvent the wheel, we are reproducing LSA’s letter below, which we endorse wholeheartedly. If you want to help make this intersection better, please contact your City Councilors and neighborhood liaisons and demand that the Department of Public Works hold public meetings and hear from the neighborhood before plowing ahead with this project. Although the plans appear to be final, this should not be a done deal. The work hasn’t started yet, so let’s make it better.

Finally, to dispel any confusion, note this is not the same intersection nor the same process currently underway regarding the Walter-Centre Street intersection. That project is under DCR control; we’ll have an update on the recent community meeting in Rozzie about this shortly.

Update: WalkBoston has also sent a comment letter.

Read More

20 Taft Hill Rendering

Official WalkUP Roslindale Comment Letter – 20 Taft Hill Park

20 Taft Hill Rendering
20 Taft Hill Rendering
Today, we sent another comment letter on a proposed development in Roslindale Square. The project is a 19-unit condominium complex a few yards away from the commuter rail station and the business district. Because we believe this sort of transit-oriented development will contribute to a more walkable and vibrant neighborhood, and particularly in view of some of the developer’s creative pro-WalkUP proposal elements (dedicated bicycle storage, car-share service credits, and support for the Roslindale Arboretum Gateway Path initiative), we generally support the project. There is still room for improvement, however, as detailed in our full comment letter below.

We hope many of you will agree with some if not all of the points made below. Either way, however, we’d love to hear your feedback in the comments.

Read More

Centre and Walter Intersection

DCR Community Meeting on Walter and Centre Street Redesign – November 10, 2015 at St. Nectarios Church Hall

Centre and Walter Intersection
Intersection of Centre and Walter Streets
The Department of Conservation and Recreation (“DCR”) recently held a series of public meetings to solicit input about the parkways of the Parkway Area–particularly the Centre Street Corridor, which accommodates 40,000 cars every day. The corridor is poorly designed for drivers, pedestrians, and bicyclists alike, and it’s time to fix it.

Although Centre Street brings thousands of cars daily right through Roslindale, no meeting has focused on or been held in Roslindale — until now. Thanks especially to the efforts of neighbor Carter Wilkie, our representatives in the state legislature have arranged for a fourth public meeting, focused especially on the intersection of Centre and Walter Streets, which has had the majority of crashes in recent years — 46 crashes over a three year period! Traffic engineers have determined this intersection violates state safety standards, but funding for improvements will be hard to secure unless people speak up. Previous meetings about this corridor have demonstrated a lack of care for and attention to pedestrians and bicyclists–it’s important that the planned improvements serve everyone, not just those who might be passing through in a motorized vehicle.

We understand (at least) Sen. Rush, Rep. Sánchez, and Rep. Coppinger will all be present at the meeting, so this is an excellent opportunity to be heard on the importance of pedestrian- and bike-friendly infrastructure in one of the worst-designed parts of our neighborhood. We’ll add to this post if we receive confirmation about attendance from any other elected officials. We should turn out in force and advocate for walkability!

Please spread the word (retweet or like/share this announcement on Facebook). Details below:

Tuesday November 10, 2015 6:30 p.m. – 8:30 p.m.
St. Nectarios Church Hall
39 Belgrade Ave. (and Robert Street)
Roslindale

More background:

20 Taft Hill Rendering

Taft Hill Development Up Next

20 Taft Hill Rendering
20 Taft Hill Rendering

Everyone is encouraged to attend the upcoming community meeting on the proposed new development at 20 Taft Hill Park, next to the municipal parking lot just north of the Square. Per the BRA, which will be hosting the meeting, essential details are as follows:

Date: Wednesday, October 21, 2015
Time: 6:30 to 8:00 pm
Location: Roslindale Community Center, corner of Washington and Cummins

Information on the proposal as submitted by the developer can be found on the BRA’s website HERE.

Basic project numbers shown there are as follows:

  • 19 residential condominium units in 2 buildings (6 units/13 units).
  • Unit mix is 2 1BRs, 15 2BRs, 2 3BRs.
  • 19 off-street parking spaces (1 per unit).
  • Bicycle storage for 34 bicycles.
  • $2,000 car-sharing service credit to each unit buyer.

Five things to consider/watch for in the meeting and in discussions over this project:

  1. Generally speaking, this is a project that fits within WalkUP Roslindale’s principles and is likely to gain our support. The location is adjacent to the square, and so walkable to its services, restaurants, shops, and transit options, and the design and program appear interested in making use of that walkability. To get the most out of this project as a neighborhood, we will want to focus much of our attention on the quality of the urban design here so that we end up with something much closer to the substation redevelopment as opposed to, for example, the redevelopment of the former Roslindale Pub site. The initial renderings suggest that this will be more like the substation, even if it is a bit of a departure from typical residential architecture in the neighborhood.
  2. According to the application, the project will require zoning relief (in this case, variances) because the site is zoned 2F-5000, a subdistrict previously discussed at this blog. Given the project’s size, it will also be subject to the city’s inclusionary development policy, also previously discussed here. That means that at a minimum 13% of the units will need to be affordable under the policy’s definition. WUR is already on record through our principles that we think this percentage is low given the scope of the need and it further doesn’t address the broader workforce housing challenge that has occupied so much of the Walsh administration’s attention and bubbled up just a couple of days ago in a slightly different context dealing with the city’s housing and jobs linkage fees. This is an issue that will need to be on the table.
  3. The developer’s decision to include bicycle parking and car-sharing credits shows a willingness to engage on encouraging active transportation in our neighborhood. To WUR, this presents the opportunity to work constructively and proactively on promoting walking, bicycling, and transit infrastructure, very much along the lines of the City’s recently released draft vision for GoBoston 2030, especially the “health”  section. New development that smartly leverages our neighborhood’s existing active transportation assets should be thinking about ways to concretely support their improvement and expansion.
  4. The 1-to-1 off-street parking ratio will be a topic of discussion and deliberation. The multiple intersecting issues that are bound up in parking were identified as needing thoughtful consideration in an early post here. Clearly, there are different sides to this issue and spillover effects on generally available on-street parking from households that own more cars than they have off-street parking spaces to put them in can have impacts. On the other hand, simply imposing a higher rate of off-street parking has multiple impacts of its own, including increasing motor vehicle traffic, taking up valuable space that could be devoted to other, more productive uses, and driving up the cost of housing to provide an “amenity” that many residents may not want. These are just a few of the considerations about parking that I’m sure will be voiced through this process.
  5. Finally, a note on process: This will be a public community meeting required as a result of the developer’s Small Project Review application. There may be more than one such meeting for this process and there will also be an accompanying written comment period that the BRA project manager will identify at the meeting. Conclusion of this BRA process with a BRA Board vote will then be followed by a process with the Board of Appeal for the variances that would almost certainly include a further public community meeting and then a hearing before the Board. In other words, there will be multiple points at which to plug into this process, be heard, and be counted.

The Rozzie Arboretum Gateway Path

A top WalkUP Roslindale initiative is a new multi-modal “gateway path” into the Arnold Arboretum directly from Roslindale Square. An introduction to our vision is below; you can also print this PDF flyer as a quick introduction to the project.

Rozzie Gateway Path Entrance (image courtesy Halvorson Design Partnership, Inc.)
Rozzie Gateway Path Entrance (image courtesy Halvorson Design Partnership, Inc.)

The Arnold Arboretum is not only Roslindale’s greatest park, but among the most beautiful urban open spaces anywhere. In 1880 Frederick Law Olmsted wrote: “On (these) acres much the best arboretum in the world can be formed.” Today, some of Olmsted’s “emerald necklace” plan has been realized, but much remains to be done.

We envision a new entrance to the Arboretum close to Roslindale Square, to make the park more visible and accessible to residents and visitors. The Rozzie Gateway Path would start adjacent to the commuter rail platform, and continue at grade into the park, allowing access to the open space without the need to surmount the large hill that lead to the Mendum Street gate.

The Path will continue straight parallel to the commuter rail tracks toward Bussey Street, and then connect up with the Bussey Brook Meadow path and on to Forest Hills.

Key Benefits

  • Better access to the Arboretum from Roslindale Square (and thus to transit node, businesses, Farmers Market, etc.)
  • Washington Street lacks pedestrians amenities [1] and is unsafe for bicyclists; the Gateway Path will provide a better alternative to reach Forest Hills, where walkers and cyclists can avail themselves to the many amenities around Forest Hills; continue on to the Southwest Corridor Park; or board the Orange Line. And of course vice-versa — folks coming down the Orange Line or the Southwest Corridor will have a superior route to visit Roslindale Village.
  • Current routes from Roslindale to Forest Hills through the Arboretum have steep hills and are more than twice as much distance as the proposed path
  • Hubway Bike-Share stations could be available at both ends, providing a quick, easy, low-stress route to connect Rozzie with JP and the Orange Line
  • Possibilities for improved Arboretum access from underserved neighborhoods, particularly the Archdale area

Discussion of the full route is still very much open. The crossing at South Street and Bussey presents the biggest challenge, although not an insurmountable one. For the penultimate section on the north side of South/Bussey, the route could proceed on either side of South Street subject to consideration Boston Water and Sewer Commission and flood-plain issues. With these caveats, below is one of the paths we are considering:

Rozzie Gateway Proposed Route (one of many!)
Rozzie Gateway Proposed Route (one of many!)

We have made significant progress in moving from idea to reality; if you’d like to learn more, please join our email list or contact us directly. We’d love to hear your suggestions or other feedback!

Footnotes    (↵ returns to text)

  1. An earlier version of this post (pre-3/9/16) suggested Washington Street is “unpleasant” for pedestrians. We discovered some people misinterpreted this statement as derogatory; the intent was to summarize the lack of crosswalks, benches, curb cuts, as well as the occasionally overly-narrow and poorly-maintained sidewalk space, rather than to suggest there is anything inherently wrong with or undesirable about this corridor. We intend to push hard for better walkability along this corridor, and the path effort is no substitute for that.
Healy Field Community Meeting Flyer

Healy Field Playground Community Meeting – October 19, 2015 at Roslindale Community Center

Healy Field Community Meeting Flyer
Healy Field Community Meeting Flyer

WalkUP Roslindale strongly supports increased and improved open space, green space, and play space in the neighborhood (ideally all three together!). Indeed, one key benefit of moderately higher-capacity housing should be to allow more space to be left over, greater more political clout, and a more stable tax base to provide enhance shared recreational space for all of us. To that end, we encourage community members to attend an upcoming meeting to about improvements to the Healy Playground (off of Florence Street).

The meeting will be Monday, October 19, 2015, 6:30pm-8pm, at the Roslindale Community Center at 6 Cummins Highway. The Parks Department is interested in what the community has to contribute to the
design process. Following a brief presentation, community members will be able to offer
input regarding the material presented and the design process.

Spread the word, and see you there!

First Official WalkUP Roslindale Comment Letter – 100 Weld Street

Sketch Plan showing WalkUP Roslindale Proposal for Weld/Centre Intersection
Sketch Plan showing WalkUP Roslindale Proposal for Weld/Centre Intersection

We’re pleased to announce WalkUP Roslindale has submitted its first comment letter, providing some feedback on the proposed 100 Weld Street development. 100 Weld has been at least a bit controversial because of its scale (17 units replacing a defunct former gas station). While the proposed development is imperfect (concerns articulated in our letter, text reproduced below), we believe on balance the increased density and revitalization of vacant space benefits Roslindale–residents and business-owners alike–and housing is sorely needed in and around Boston. See below for our complete analysis.

Read More

Exactly

IMG953432-2

This photo was taken yesterday at the Roslindale Farmers Market. I assume RVMS gathered the information and made the display. Well done, guys! Exactly the kind of thinking about the area that’s needed. Really makes the argument about how much is within very short walking distance. Our focus should be on finding ways for those steps to be easier and safer to make, increasing the number of places you can get to by walking, and supporting old and new neighbors who want to take those steps!

(Revised slightly after initial posting.)

Living on Earth and Complete Streets in Boston

Cambridge Street Bridge
Cambridge Street Bridge with cycle track

Excellent Living on Earth piece this week about the “Complete Streets” movement, focused on Cambridge Street in Allston. The segment features an interview with then-deputy director of the National Complete Streets Coalition, Stefanie Seskin, now Boston’s Director of Active Transportation. Also interviewed is Vineet GuptaBoston Transportation Department head of policy and planning.

It’s been nearly 75 years since World War II ended, yet much transportation planning is still based on that obsolete paradigm. The Living on Earth piece concludes on a hopeful note that the pace of change is picking up:

SESKIN: Post World War II, we embarked in the United States and in many other countries, on a massive infrastructure investment to move goods really across the country. And that had a lot of really important and good changes to the way that we built our roads in terms of safety when you’re travelling at high speeds, when you’re thinking about trucks and how they move.

LUCAS: But Seskin says while wide lanes make highways and other high-speed roads safer for traffic using them, they were never meant for cities and town centers. And yet city streets were built the same way as those high-speed roads. Vineet Gupta of Boston’s Transportation Department says that post-war engineering mentality explains why Cambridge Street is so bad for pedestrians today.

GUPTA: In those days, all they cared about was moving traffic and making traffic flow more efficient, and really not focusing on what cities really are, and what makes them livable.

LUCAS: That’s where people-oriented complete streets are different.And the idea has been gaining traction around the country.The National Complete Streets Coalition says that the number of places with complete street policies leaped from 86 in 2008 to 610 last year. Stephanie Seskin has noticed.

We haven’t seen much of this progress yet in Roslindale. It’s our job to push both elected and appointed officials to bring Complete Streets to our neighborhood sooner rather than later. We should be leading rather than trailing.