We hope many of you will agree with some if not all of the points made below. Either way, however, we’d love to hear your feedback in the comments.

We hope many of you will agree with some if not all of the points made below. Either way, however, we’d love to hear your feedback in the comments.
Although Centre Street brings thousands of cars daily right through Roslindale, no meeting has focused on or been held in Roslindale — until now. Thanks especially to the efforts of neighbor Carter Wilkie, our representatives in the state legislature have arranged for a fourth public meeting, focused especially on the intersection of Centre and Walter Streets, which has had the majority of crashes in recent years — 46 crashes over a three year period! Traffic engineers have determined this intersection violates state safety standards, but funding for improvements will be hard to secure unless people speak up. Previous meetings about this corridor have demonstrated a lack of care for and attention to pedestrians and bicyclists–it’s important that the planned improvements serve everyone, not just those who might be passing through in a motorized vehicle.
We understand (at least) Sen. Rush, Rep. Sánchez, and Rep. Coppinger will all be present at the meeting, so this is an excellent opportunity to be heard on the importance of pedestrian- and bike-friendly infrastructure in one of the worst-designed parts of our neighborhood. We’ll add to this post if we receive confirmation about attendance from any other elected officials. We should turn out in force and advocate for walkability!
Please spread the word (retweet or like/share this announcement on Facebook). Details below:
Tuesday November 10, 2015 6:30 p.m. – 8:30 p.m.
St. Nectarios Church Hall
39 Belgrade Ave. (and Robert Street)
Roslindale
More background:
Everyone is encouraged to attend the upcoming community meeting on the proposed new development at 20 Taft Hill Park, next to the municipal parking lot just north of the Square. Per the BRA, which will be hosting the meeting, essential details are as follows:
Date: Wednesday, October 21, 2015
Time: 6:30 to 8:00 pm
Location: Roslindale Community Center, corner of Washington and Cummins
Information on the proposal as submitted by the developer can be found on the BRA’s website HERE.
Basic project numbers shown there are as follows:
Five things to consider/watch for in the meeting and in discussions over this project:
A top WalkUP Roslindale initiative is a new multi-modal “gateway path” into the Arnold Arboretum directly from Roslindale Square. An introduction to our vision is below; you can also print this PDF flyer as a quick introduction to the project.
The Arnold Arboretum is not only Roslindale’s greatest park, but among the most beautiful urban open spaces anywhere. In 1880 Frederick Law Olmsted wrote: “On (these) acres much the best arboretum in the world can be formed.” Today, some of Olmsted’s “emerald necklace” plan has been realized, but much remains to be done.
We envision a new entrance to the Arboretum close to Roslindale Square, to make the park more visible and accessible to residents and visitors. The Rozzie Gateway Path would start adjacent to the commuter rail platform, and continue at grade into the park, allowing access to the open space without the need to surmount the large hill that lead to the Mendum Street gate.
The Path will continue straight parallel to the commuter rail tracks toward Bussey Street, and then connect up with the Bussey Brook Meadow path and on to Forest Hills.
Key Benefits
Discussion of the full route is still very much open. The crossing at South Street and Bussey presents the biggest challenge, although not an insurmountable one. For the penultimate section on the north side of South/Bussey, the route could proceed on either side of South Street subject to consideration Boston Water and Sewer Commission and flood-plain issues. With these caveats, below is one of the paths we are considering:
We have made significant progress in moving from idea to reality; if you’d like to learn more, please join our email list or contact us directly. We’d love to hear your suggestions or other feedback!
WalkUP Roslindale strongly supports increased and improved open space, green space, and play space in the neighborhood (ideally all three together!). Indeed, one key benefit of moderately higher-capacity housing should be to allow more space to be left over, greater more political clout, and a more stable tax base to provide enhance shared recreational space for all of us. To that end, we encourage community members to attend an upcoming meeting to about improvements to the Healy Playground (off of Florence Street).
The meeting will be Monday, October 19, 2015, 6:30pm-8pm, at the Roslindale Community Center at 6 Cummins Highway. The Parks Department is interested in what the community has to contribute to the
design process. Following a brief presentation, community members will be able to offer
input regarding the material presented and the design process.
Spread the word, and see you there!
We’re pleased to announce WalkUP Roslindale has submitted its first comment letter, providing some feedback on the proposed 100 Weld Street development. 100 Weld has been at least a bit controversial because of its scale (17 units replacing a defunct former gas station). While the proposed development is imperfect (concerns articulated in our letter, text reproduced below), we believe on balance the increased density and revitalization of vacant space benefits Roslindale–residents and business-owners alike–and housing is sorely needed in and around Boston. See below for our complete analysis.
This photo was taken yesterday at the Roslindale Farmers Market. I assume RVMS gathered the information and made the display. Well done, guys! Exactly the kind of thinking about the area that’s needed. Really makes the argument about how much is within very short walking distance. Our focus should be on finding ways for those steps to be easier and safer to make, increasing the number of places you can get to by walking, and supporting old and new neighbors who want to take those steps!
(Revised slightly after initial posting.)
Excellent Living on Earth piece this week about the “Complete Streets” movement, focused on Cambridge Street in Allston. The segment features an interview with then-deputy director of the National Complete Streets Coalition, Stefanie Seskin, now Boston’s Director of Active Transportation. Also interviewed is Vineet Gupta, Boston Transportation Department head of policy and planning.
It’s been nearly 75 years since World War II ended, yet much transportation planning is still based on that obsolete paradigm. The Living on Earth piece concludes on a hopeful note that the pace of change is picking up:
SESKIN: Post World War II, we embarked in the United States and in many other countries, on a massive infrastructure investment to move goods really across the country. And that had a lot of really important and good changes to the way that we built our roads in terms of safety when you’re travelling at high speeds, when you’re thinking about trucks and how they move.
LUCAS: But Seskin says while wide lanes make highways and other high-speed roads safer for traffic using them, they were never meant for cities and town centers. And yet city streets were built the same way as those high-speed roads. Vineet Gupta of Boston’s Transportation Department says that post-war engineering mentality explains why Cambridge Street is so bad for pedestrians today.
GUPTA: In those days, all they cared about was moving traffic and making traffic flow more efficient, and really not focusing on what cities really are, and what makes them livable.
LUCAS: That’s where people-oriented complete streets are different.And the idea has been gaining traction around the country.The National Complete Streets Coalition says that the number of places with complete street policies leaped from 86 in 2008 to 610 last year. Stephanie Seskin has noticed.
We haven’t seen much of this progress yet in Roslindale. It’s our job to push both elected and appointed officials to bring Complete Streets to our neighborhood sooner rather than later. We should be leading rather than trailing.
And the manner of the response could bode well for how our commonwealth’s new administration views major projects in urban areas
By necessity, WalkUP Roslindale’s focus is primarily on Roslindale Square and its immediate vicinity. But what is now happening with Casey Arborway — the MassDOT project currently underway to demolish the old Route 203/Casey Overpass at Forest Hills and replace it with a network of at-grade streets — also matters a lot. There is no denying that the construction has made the area more difficult to navigate in the short term: the area right now is a mix of permanent and temporary roadways and paths and demolition of the old overpass is ongoing. Ultimately, once completed, Casey Arborway promises a more connected, accessible, and livable Forest Hills for everyone.
For those who have followed the project for the last several years as it wound its way through the public process, the most regrettable outcome has been the bitter split among many politically active players in Jamaica Plain over the wisdom of MassDOT’s decision to go with the at-grade network over reconstructing or replacing the overpass. Since the decision was originally announced in March 2012, Bridging Forest Hills, the anti-at-grade group, has managed to hold itself together even as the project has moved forward through design, final approvals, selection of the contractor, and even commencement of construction this spring. The last move the group made was a petition and direct appeal this spring to Governor Baker to halt the project and consider a new direction. Putting aside the practicalities of doing that at this late stage, we all know stranger things have happened and so those on both sides of the issue were still waiting with some interest to see how the governor would respond.
And so he now has. The text of the email from the governor’s office was recently posted at BFH’s website and it does indeed look like the final word. In a brief but substantive response worth reading in full, his deputy chief of staff touches principally on the level of inclusion and robustness of the public process and the way the project evolved over time. In terms of looking forward and thinking about how MassDOT will evaluate their urban projects in the future (such as the Allston Interchange/Beacon Yards project, about which Renee Loth wrote in today’s Globe), the key passage for me is this:
The at-grade option was advanced because it ranked the highest for all forms of mobility, livability, and long term maintenance costs.
Those 3 criteria — mobility across modes, livability, and long-term maintenance costs — are pretty good measures if you’re looking to boil things down. For way too long we allowed one of those criteria and one mode within it to control decision-making. The Casey Arborway represents a new direction that I hope is replicated more often at all levels of government.
Add another ingredient to the mix at what is becoming a hot corner: Green T Cafe just announced they are moving into the former Christos Market space on the corner of Walter and South streets. Some limited activity had been noticeable a few weeks back, but over the past weekend a dumpster materialized (was quickly filled and already replaced) and work appeared to be starting in earnest. The news popped up on the LANA NextDoor group as well as the Keep Roslindale Quirky facebook page, and on Green T’s own website/facebook page. Timing sounds like this fall/winter. This is a big change – the location has been vacant for several years and we have been in desperate need for a neighborhood coffee shop for almost as long.
Green T’s impending arrival signals that there is retail potential at this corner. Further to the recent post about the proposed residential development across South Street, I would suggest again that there is a meaningful basis for more commercial activity at this corner (again, just down the street from where I have lived for 15 years), not less. And one way that the South Street developer might straddle the fence would be to include one or two live/work units on the ground floor street frontage of the building. I suspect, without researching the question, that live/work units at that location (and probably almost everywhere else in Boston) would require a variance from the existing zoning. But the advantages in affordability, flexibility of use and allowing the building to evolve with changing circumstances would be significant. Something to consider here and possibly elsewhere in Roslindale where retail might work but hasn’t been proven yet or has been dormant for an extended period.