We last reported on this important location a couple of weeks ago, when construction notices went up and we were eager to see the thoughtful plan that BTD had prepared become a reality. Now, as we hit 210 days and counting, we are still at the stage where nothing has happened within the street to physically address the crash that killed one of our neighbors. As you can see from the photo, the last two weeks brought wheelchair-accessible ramps at 2 corners where a new crosswalk is to go, and bases for the poles that will hold the crosswalk flashing beacon equipment. All of the construction signs and cones/barrels have been moved out and we are again wondering exactly how much longer this will have to wait. I asked this question of PWD on Friday via Twitter, and informed that their contractor “is scheduling remaining work” and they will “update when the schedule is available.” I think we can all agree that we hope the work is done very, very soon – in other words, in a matter of days. We are now well over six months since this tragedy occurred, and this response has been painfully slow in arriving.