“Kids need safe streets” – Video from Brooklyn Rally

Powerful video here on a well-attended march to protest traffic violence from Brooklyn, where 2 young children were killed last week while walking in a crosswalk with their mothers by a reckless driver with a long history of moving violations, including speeding in school zones, though this crash occurred at a regular crosswalk. Considering what has happened in our city and region recently, we need to consider, seriously and candidly, whether we are doing enough to stop traffic violence and protect everyone on our streets – every senior, every child, every person with mobility issues, and, really, every single one of us – who isn’t in a motor vehicle. I’m afraid that the answer is no. We must do more and we most do it more quickly. I’m with the commenter who says they don’t want safety changes to wait until the next tragedy. We need them everywhere now. Now. NOW.

Two personal notes: (1) Park Slope, where the most recent tragedy occurred, happens to be the neighborhood I grew up in; and (2) folks who have worked with LivableStreets Alliance over the last couple of years will recognize Nidhi Gulati, who recently relocated to NY, at about the 4:00 mark in the video.

The Roslindale Pedestrian/Cycling/Transit Infrastructure Report – Inaugural Edition

Going forward, WalkUP Roslindale will try to keep a current inventory of improvements to our neighborhood’s pedestrian, cycling, and transit infrastructure. Accordingly, as of 26 February 2018, the below is what we’re aware of:

  • Flashing Beacon Crosswalks – 3 (complete: Washington/Blue Ledge, Washington/Basile, Washington/South of Ukraine); 3 (partially complete: Centre Street adjacent to the Arboretum)
  • Buffered Bike Lanes – 1.3 miles (N/S on American Legion from Cummins to HP Avenue; N on Washington from WR Parkway to Beech)
  • Protected Bike Lanes – 3.0 miles (E/W on Blackwell Shared Use Path; Arborway from Arboretum Gate to South Street; Arborway from Orchardhill to Forest Hills Cemetery)
  • Speed humps – 0
  • Raised crosswalks – 0
  • Daylighted Crosswalks – 3 (Washington/Blue Ledge, Belgrade/South, Washington/Basile)
  • Bus Priority Facilities – 1 (operational bus/bike lane pilot in December on Washington from Cummins to Ukraine – multi-week pilot expected this spring)
  • Hubway Stations – 0 (hopefully some to come later this year)

We welcome any additions/subtractions to this list. Thanks!!

Some pretty good urbanism reading on a long holiday weekend

Check out this article from a self-identified conservative professor of philosophy:

Philosopher embraces New Urbanism.

In brief, these concepts and the benefits that flow from them aren’t just for Dirty Hippies, Slackers, and Hipsters. And contemplate for a moment how closely the streetcar neighborhood in Grand Rapids resembles our own patch of this earth in terms of the richness of accessible amenities. I’ll just leave the opening preamble of the Charter of the New Urbanism, quoted in the article, here while noting that even as Boston’s population grows and the initial issue is not so much about private disinvestment, we still struggle with bringing our city’s politics, policies, and actions around to meet the challenges that remain:

The Congress for the New Urbanism views disinvestment in central cities, the spread of placeless sprawl, increasing separation by race and income, environmental deterioration, loss of agricultural lands and wilderness, and the erosion of society’s built heritage as one interrelated community-building challenge.

2017 – WUR’s year in review

With the books now closed on 2017, let’s take a moment to reflect on another year in the life of WalkUP Roslindale, your neighborhood walk-bike-transit-Y/QIMBY (Yes/Quality in My Backyard) citizens group. In the opinion of your humble correspondent, below are the top 7 highlights of the year just concluded. Comments, corrections, and additions are always welcome!

  1. Washington Street Operational Bus Improvements Pilot – It came late in the year (and on just 2 Tuesday mornings in December). But the first test of a bus-only lane (shared with people on bikes as well) on Washington Street from Roslindale Square to Ukraine Way from 7 am to 9 am was a widely-hailed successful proof of concept. Bus riders saved significant time, people riding bikes in the corridor generally approved of the shared lane, and the Boston Transportation Department and the MBTA showed they could work quite well together on the first such test case in an outlying neighborhood. It is hard to overstate how big a deal this is — there are several corridors around Boston that desperately need the kind of low-upfront-capital but meaningful time-saving improvements to bus service that was demonstrated for the first time in this city here in Roslindale. A full 2-week pilot is reportedly planned for the spring. Dates and specifics are still TBD. WalkUP Roslindale will do everything it can to support the full pilot and ultimately implementation of a permanent set of improvements. We appreciate the advocacy and support of the proposal from City Councilors Wu and McCarthy as well as BTD’s strong performance on the 2 days of the operational pilot. Special thanks are also owed to LivableStreets Alliance for their persistent advocacy, particularly their Street Ambassadors, who teamed with certain WUR diehards (Messrs. Tedrow, Gag, and Tobin come to mind) on outreach this fall and then during the operational pilot.
  2. Mt. Hope-Canterbury gets Roslindale’s nod for the Neighborhood Slow Streets Program – A grand total of 47 applications were submitted to BTD’s program to install new neighborhood slow streets areas around Boston. Five applicants were picked, and our own Mt. Hope-Canterbury area in eastern Roslindale made the cut. We look forward to seeing the work of MHC stalwarts Lisa Beatman and Rick Yoder and their neighbors in that part of our neighborhood come to fruition in their new NSS by year-end. And herewith our periodic reminder that everyone in Boston deserves to live on a safe street. Everyone on every street in every neighborhood.
  3. Roslindale’s First Street Mural – Our neighborhood’s first street mural was laid down in June at the intersection of Conway and South streets, on the Peters Hill side of the MBTA commuter rail station. This was a great community building event and collaboration with the Mayor’s Mural Crew staff (especially Heidi Schork), BTD, Roslindale Village Main Street, Cornell Coley (Roslindale’s Artist-in-Residence), and our own Rachele Rosi-Kessel, Rebecca Phillips, Mandana Moshtaghi, and Ann-Marie Lawlor.
  4. At-Large City Councilors and Candidates Forum on Active Mobility Issues – WUR was significantly gratified to pull together a forum featuring all 8 current councilors and candidates in October to discuss active mobility issues affecting Roslindale and the city at large. Attendance was strong and we were able to livestream the forum as it was progressing. Particular thanks are due for this event to the Roslindale Community Center for making their downstairs meeting room available for an extended period on the evening of the forum.
  5. Green Shoots Pedestrian Improvements in Roslindale Square – WUR’s late 2015 collaboration with WalkBoston on a walk audit of Roslindale Square finally bore fruit in the spring of this year when key improvements were made to the Basile/Washington crosswalk (including fix the blinking yellow light, installing a handicapped accessible ramp and daylighting with flexposts) and Belgrade/South (including no parking in the area between the crosswalks and daylighting with flexposts). In addition to these major changes, we also saw a new crosswalk near the Robert Street underpass for the MBTA and a new crosswalk center delineator on Belgrade near Robert/Corinth. We hope to see more improvements around the square in the coming year.
  6. Roslindale Gateway Path continues to make progress and draws major foundation support – The early spring saw the release of the 10% design for the Roslindale Gateway Path at a community meeting at the Arnold Arboretum’s Weld Hill research facility, followed a couple of months later by an announcement of formal collaboration with the Arboretum Park Conservancy on a combined Roslindale Gateway/Blackwell Path project. The combined path effort then had the good fortune, with support from LivableStreets Alliance, the Arboretum and BTD, to obtain funding from the Solomon Foundation for advancing the design to the 25% level. Look for the release of the 25% design at some point this spring.
  7. Smarter residential development continues across the neighborhood – Last, but not least, WUR advanced our Y/QIMBY agenda in support of residential development that we thought worthwhile, especially 874-878 South Street (around the corner from your correspondent’s house), 32 Cummins Highway (down the block from the post office), and 4281 Washington Street (the Brayton’s Upholstery building). Our city is growing and need to welcome new residents by building new units form them instead of making them compete with existing residents over existing units.

Some thinking about walkable neighborhoods and why “affordable” neighborhoods are about more than just housing costs…

 

Why walkability is not a luxury

This is a longish read from Rob Steuteville at Public Square and it glosses over some of the deeper issues on disinvestment in our cities in the second half of the 20th century and the hard set of issues that arise from displacement as demand and investment return. But I commend it to help frame the ongoing debate here in Boston and in Roslindale about growth, walkability, and what makes a neighborhood affordable.

If you concentrate on just housing costs, you’re missing half of the direct cost picture and much of the indirect environmental and public health costs. To know if a neighborhood is truly affordable, both housing and transportation costs need to be considered, and then environmental and health impacts have to be layered in on top of that. On this basis, one finds that neighborhoods that seem expensive really aren’t that expensive and neighborhoods that seem affordable really aren’t that affordable. Discuss.

IMPORTANT UPDATES: Roslindale-focused City Council Candidates Forum – Tues., Oct. 3 @ 6:30 pm @ RCC

 

UPDATE 1: District 5 Councilor Tim McCarthy has just informed us that he will be unavailable for the October 3rd forum because he will be testifying on that day before congressional hearings about the airplane noise issue in Washington, DC. We wish Tim luck in DC fighting for us on this important neighborhood concern. We are accordingly going to reschedule that panel for a date TBD later in October.

UPDATE 2: At-Large City Council candidate William King has let us know that he will be able to participate in the forum. This is great news and we look forward to an informative evening on October 3rd.

UPDATE 3: We will use the time from 6:30 to 7:15 pm to have an open forum discussion coordinated by WalkUP Roslindale, so please feel free to come early and help us identify and move forward on the issues that matter to you.

As we’ve previously announced, the forum will address the issues we focus on — active mobility and new housing and commercial development in our neighborhood. We see these issues as inextricably linked and mutually reinforcing.

Hope to see you at the forum! If you’re interested in attending, please let us know on our facebook page event entry. Thanks!!!

Join GirlTrek on 10/6 for a Fannie’s Army Walk


From time to time, we take some extra time to publicize what we think are worthy walking or cycling or transit-related events around the area. There’s one of those coming up next month with GirlTrek Boston’s participation in the Fannie’s Army series of walks to celebrate the 100th anniversary of the birth of legendary civil rights (especially voting rights) activist Fannie Lou Hamer. Here’s information on the walk and how to sign up. The walk will be from 6 to 8 pm, starting and ending at the Roxbury YMCA at 285 Martin Luther King Boulevard. Note that participation in GirlTrek walks is limited to women (though you need not be a GirlTrek member).

Roslindale Film Series – Fall 2017 Edition – October 19 and 30

Third Rail may not be coming to the Substation, but the Roslindale Film Series most definitely is. RVMS just announced that there will be 2 classics on offer in the Substation in October — first, on Thursday, October 19 at 7 pm, they will be showing the technicolor pioneer The Wizard of Oz, and then, second, on Monday, October 30 at 7 pm, we will have Ghostbusters in all of its mid-1980s ironic absurdity.

WalkUP Roslindale has long supported showing feature-length movies in the square and we are excited about this most recent development. We urge everyone to attend and to walk, cycle, or take transit to get there as parking is limited! But bring your own seating and refreshments!

Roslindale Gateway Path & Blackwell Path Extension – Now combined and on the move!

Rozzie Gateway Path Entrance (image courtesy Halvorson Design Partnership, Inc.)

We last updated folks on the progress of the Roslindale Gateway Path when we, along with our partners LivableStreets Alliance, the Arnold Arboretum, and Roslindale Village Main Street, released the conceptual design study back in April of this year. Since then, we have discussed more seamlessly weaving together and unifying the RGP with the Blackwell Path Extension that the Arboretum Park Conservancy has been promoting on roughly the same timeframe. Those discussions resulted in a joint meeting with city officials in June 2017 to put the combined project squarely on their radar and just a few days ago the decision by the Solomon Foundation to provide $29,000 in funding to advance the combined project to 25% design. The Arnold Arboretum will be facilitating this work with Solomon and the design consultants at Horsley Witten Group and we look forward to releasing and publicly discussing this design when it is released later this year. So, special thanks to Solomon and the Arboretum for keeping the momentum up on this effort!