We are fortunate to have neighborhood-level professional journalists at the Roslindale Bulletin covering important local issues; even more so now that the entire paper is available online. In late January, the Bulletin reported several stories that should be of interest to the WalkUP community. Highlights below: Read More
Category: Paths
WalkBoston offering Ped 101 Advocacy Training – Multiple Dates/Times in Jan-Feb-Mar – FREE
Here’s WalkBoston’s brief announcement at the EventBrite page:
In 2016, WalkBoston is rolling out free, beginner advocacy trainings called “Ped 101” – and we’d love you to come! Our office is located at 45 School Street, Boston, MA 02108 in Old City Hall. Sessions are small group conversation over lunch or drinks and are hosted in our conference room – so please make sure to sign up in advance!
This session is helpful if you’re interested in learning about:
- walkability, urbanism & the associated lingo (what’s a “tight turning radius”?),
- making neighborhoods safer for people walking & running, and
- how you can advocate for change in your own community.
- SIGN UP BY GOING: HERE.
Late-addition to the Roundup List: Arboretum Gateway Path
I have fielded more than one note that I left the Arboretum Gateway Path off the top-of-mind list for WUR’s 2015 roundup. This is an accurate critique and so: mea culpa. The AGP was a major initiative in 2015 and, I strongly suspect, will be a major initiative this year and going forward until it’s done. In brief: We love this idea of a new Arboretum gateway and path at the Roslindale commuter rail station that would provide an alternate ped/bike path to the South/Archdale bridge area, where it would link to an extension of the existing Blackwell/Bussey Brook path (and on to Forest Hills and the Southwest Corridor path) and allow for a new, more welcoming entrance to the Arboretum at Archdale as well. We are furthermore delighted at the receptive potential partners we’ve found in our own City and State government, the Arnold Arboretum, the Arboretum Park Conservancy, RVMS, Livable Streets, and our friends at Tufts University’s environmental program who are currently conducting an initial feasibility analysis for the path. It’s also been a great way to connect early with our friends at Rozzie Bikes.
So — as we head into 2016, expect the Arboretum Gateway Path to be something we continue to talk about and organize around, a lot.
Boston’s Vision Zero Action Plan and sharing the Arboretum Gateway Path with our friends at LivableStreets’ 10-in-1 Street Talk
As part of our effort to spread the word and gather more support for the Arboretum Gateway Path concept, I was excited to have the opportunity to do a 7 minute presentation at LivableStreets Alliance’s 10-in-1 Street Talk last Wednesday night at the Old South Meeting House downtown. This is the 10th anniversary for these talks, and they’re a great way to connect with folks who have similar interests and advocating for making our streets and public places better and safer for everyone. LivableStreets has posted some photos from the event on their facebook page. I’ll share the video of the whole thing as soon as I see it posted in a public forum, but I was most struck during the evening by the presentation from Mark Chase of Somerville Neighborways. You should check out the images on the website, especially the concept of stressing the importance and local ownership of key intersections with resident-organized and applied graphics painted directly on the pavement. Pretty impressive and something that we should look into doing here in Roslindale – I have my own thoughts on where, and I’m sure others in our neighborhood do as well.
The evening got off to a great start with the semi-surprise of the Mayor’s announcement of the city’s Vision Zero Action Plan in a short video, which was followed by reinforcing remarks from BTD Commissioner Gina Fiandaca. Chief of Streets Chris Osgood was also personally in attendance to emphasize the importance of the announcement. The whole action plan is worth looking at and taking part in as it moves forward. But I would say that among the most interesting and important early action items is the institution of neighborhood slow speed zones in the Talbot-Norfolk triangle near Codman Square in Dorchester and between Washington Street and Franklin Park in Jamaica Plain’s Stonybrook section. My own understanding is that this is mainly a matter of lowering the speed limit from 30 to 20 mph and highlighting that fact with signage and enhanced crosswalk treatments and related measures. Bottom line: The pilots are a great idea, long past due, yet fundamentally every residential area in the city should get the same treatment, as soon as the city can get the standard package set next spring and summer through the pilots and then roll them out. The data on vehicle speed vs. fatality rates for pedestrians are uniform on pointing to the shift from 30 to 20 pm as being absolutely essential. If we can get actual vehicle speeds to that lower level on our neighborhood streets, we will have accomplished something of real and lasting value.
East Roslindale Urban Wild Bicycle Tour Tomorrow (Sunday 10/18/15) at 8am!
A group of citizens have been acting to protect and enhance the green space corridor in the American Legion Parkway area of Roslindale. Thus far, the response from the community and elected leaders has been overwhelmingly positive. But to really appreciate the area’s potential, you need to see it firsthand. Please join us for a brisk sunny bicycle tour, tomorrow morning (Sunday, October 18) at 8am, starting at the Stop-n-Shop Plaza (Walgreen’s end) on American Legion Highway near Hyde Park Ave. Complete details in this PDF flyer; meeting point pictured below. RSVP or questions to Laura Smeaton or Lisa Beatman.
The Rozzie Arboretum Gateway Path
A top WalkUP Roslindale initiative is a new multi-modal “gateway path” into the Arnold Arboretum directly from Roslindale Square. An introduction to our vision is below; you can also print this PDF flyer as a quick introduction to the project.
- Update 9/23/22 – Fall 2022 Gateway Path Update
- Update 3/1/20 – Spring 2020 Gateway Path Update – New 25% Concept Plan, Demolition Started at Bussey Brook Meadow
- Update 3/17/19 – Slides now available from 25% design meeting for Gateway Path
- Update 2/18/19 – Bussey Brook Meadow Path Gets Recommendation for CPA funding!
- Update 2/14/19 – Community Meeting on February 28, 2019 at Menino/Archdale Community Center for Gateway Path 25% Design of Entire Path
- Update 7/12/18 – Community Meeting on July 25, 2018 at Roslindale Community Center for Gateway Path 25% Design of MBTA Section
- Update 6/24/18 – Major Step Forward for the Gateway Path – Possible Funding from the Commonwealth
- Update 8/17/17 – Roslindale Gateway Path & Blackwell Path Extension – Now combined and on the move!
- Update 5/9/17 – Roslindale Gateway Path 10% Conceptual Plan, and onward!
- Update 5/2/17 – Roslindale Gateway Path 10% Conceptual Plan Public Meeting – Monday, May 8, 2017 6:30pm at Weld Hill Building in Arboretum and Jane’s Walk of Proposed Path Route on Sunday, May 7, 2017 at 1pm
- Update 12/2/16 – Path tour and feedback session this Saturday, 12/3/16 10am, starting at the Mendum Street Gate entrance to Peters Hill section of Arboretum
- Update 6/20/16 – Ride/walk this Friday, 6/24/16 at 4pm at Forest Hills entrance to Blackwell Path
- Update 5/14/16 – Community Vision Report Complete
- Update 11/6/15 – Updated/Improved Version of Flyer With Modified Proposed Route.
- Update 3/7/16 – Arboretum Gateway Path Visioning Session March 30, 2016 at 6:30pm.
The Arnold Arboretum is not only Roslindale’s greatest park, but among the most beautiful urban open spaces anywhere. In 1880 Frederick Law Olmsted wrote: “On (these) acres much the best arboretum in the world can be formed.” Today, some of Olmsted’s “emerald necklace” plan has been realized, but much remains to be done.
We envision a new entrance to the Arboretum close to Roslindale Square, to make the park more visible and accessible to residents and visitors. The Rozzie Gateway Path would start adjacent to the commuter rail platform, and continue at grade into the park, allowing access to the open space without the need to surmount the large hill that lead to the Mendum Street gate.
The Path will continue straight parallel to the commuter rail tracks toward Bussey Street, and then connect up with the Bussey Brook Meadow path and on to Forest Hills.
Key Benefits
- Better access to the Arboretum from Roslindale Square (and thus to transit node, businesses, Farmers Market, etc.)
- Washington Street lacks pedestrians amenities [1] and is unsafe for bicyclists; the Gateway Path will provide a better alternative to reach Forest Hills, where walkers and cyclists can avail themselves to the many amenities around Forest Hills; continue on to the Southwest Corridor Park; or board the Orange Line. And of course vice-versa — folks coming down the Orange Line or the Southwest Corridor will have a superior route to visit Roslindale Village.
- Current routes from Roslindale to Forest Hills through the Arboretum have steep hills and are more than twice as much distance as the proposed path
- Hubway Bike-Share stations could be available at both ends, providing a quick, easy, low-stress route to connect Rozzie with JP and the Orange Line
- Possibilities for improved Arboretum access from underserved neighborhoods, particularly the Archdale area
Discussion of the full route is still very much open. The crossing at South Street and Bussey presents the biggest challenge, although not an insurmountable one. For the penultimate section on the north side of South/Bussey, the route could proceed on either side of South Street subject to consideration Boston Water and Sewer Commission and flood-plain issues. With these caveats, below is one of the paths we are considering:
We have made significant progress in moving from idea to reality; if you’d like to learn more, please join our email list or contact us directly. We’d love to hear your suggestions or other feedback!
- An earlier version of this post (pre-3/9/16) suggested Washington Street is “unpleasant” for pedestrians. We discovered some people misinterpreted this statement as derogatory; the intent was to summarize the lack of crosswalks, benches, curb cuts, as well as the occasionally overly-narrow and poorly-maintained sidewalk space, rather than to suggest there is anything inherently wrong with or undesirable about this corridor. We intend to push hard for better walkability along this corridor, and the path effort is no substitute for that.↵
Southwest Corridor to Roslindale and Beyond
The Parkland Management Advisory Committee, created in the 1970s to advise on the Southwest Corridor Park planning process, recently conducted a survey of corridor users. Lots of interesting results, including several relating to the sometimes challenging interactions between pedestrians and bicyclists, but perhaps most relevant here:
57% of survey respondents live or work in Jamaica Plain, 23% in the Back Bay or South End, 16% in Roxbury, 5% in the Fenway neighborhood and 14% in other neighborhoods or cities. Among the other neighborhoods and cities, Roslindale was the most frequently mentioned.
Emphasis added (note that Roslindale wasn’t offered as a “checklist” option).
Once the Casey Overpass project is complete, entering the Southwest Corridor at Forest Hills should be a pleasant experience. The path is already a heavily-used nonmotorized highway from Southwest Boston to downtown; it is possible, for example, to take bike paths and wide bike lanes all the way from the Southwest Corridor to the water’s edge in the Seaport via the Melnea Cass bike path, Silver Line shared bike lane on Washington Street, and the Fort Port channel path across from the central USPS facility. Lots remains to be done to improve this thoroughfare (perhaps a topic for a future blog entry) but it’s a decent start.
But thousands of users who start out beyond Forest Hills have few pleasant options to reach the start of the corridor. It’s possible to walk or bike through the Arboretum, but that route is around 2x-3x longer than the straight shot from Rozzie Village to Forest Hills. Let’s envision a dedicated straight-shot path (e.g. through the arboretum, or along one of the rail rights-of-way), Hubway stations at both ends, and the phenomenal community, health, social, traffic, and mobility benefits that would come to both JP and Roslindale from that connection. Much crazier ideas have been implemented–we can and will make this happen.