A cloudy but not too cold day. We had six stalwarts (see photo below, one of our number had to leave a couple minutes earlier) and note that the Dynamic Duo of Guptill and Tedrow kept their perfect record intact. Being out at this location, which was the subject of a Vision Zero Rapid Response installation after Silvia Acosta’s death last year, reminded us that we need to follow up, repair the broken/missing flexposts, and move toward making the installation permanent. And so on we go!
Tag: Washington at Blue Ledge
3 observations about where we stand at Washington@Blue Ledge
-
Not Random. The reconfiguration at Washington & Blue Ledge is part of the City of Boston’s ongoing effort to implement the Vision Zero Policy adopted about 18 months ago. Under this policy, which several cities have adopted around the US, our city has set a goal of reaching zero deaths among all users of our streets – drivers and passengers in motor vehicles, pedestrians, bicyclists, and others in alternative forms of wheeled/motorized transportation – by the year 2030. A major focus of the policy’s implementation is to respond to each crash involving serious injury or death by examining their location and making changes to improve safety. Washington@Blue Ledge is where Roslindale resident Silvia Acosta was killed by a speeding hit-and-run driver while in a crosswalk in mid-January of this year. The reconfiguration that is now under way seeks to reduce motor vehicle speeds and the so-called “double-threat” in the part of the crosswalk that crosses the northbound direction of Washington Street. Reducing vehicle speeds has a huge impact on whether pedestrians survive a motor vehicle crash — your chances of dying increase from
under 10% at 20 mph, to over 50% at 30 mph, to over 80% at 40 mph. The double-threat is something I’m sure we’ve all experienced, where a crosswalk crosses two lanes in the same direction, the car in one lane stops, while the car in the second lane can’t see the pedestrian for whom the stop is being made, posits that they are stopping for no reason, and goes around them, hitting the pedestrian in the process. This is a big step forward for this intersection.
- Not Done. The reconfiguration at this location is not yet done. Boston PWD’s contractor should soon be installing (a) flex posts and bollards to delineate both the painted bump out on the southbound side and the pedestrian median, and (b) a push-button activated flashing beacon signal for the new crosswalk. Those of us who are focused on improving pedestrian and bicyclist safety in our neighborhood are intensely interested in this intersection and will be watching closely in the next few days to make sure these final actions are taken as soon as possible.
- Not Adjusted to Overnight. Observations have been made that the new configuration has not yet taken hold and some drivers are still using the new bike lane as if it remains a motor vehicle lane. While unfortunate, this is not surprising. The installation isn’t done yet, and the experience around town is that getting drivers to comply with new roadway configurations takes time and patience. If vehicle speeds are slowing as drivers adjust, see point 1, above. The intent is that the new configuration will reduce vehicle speeds permanently by narrowing the travel lanes and improving pedestrian and bicyclist safety.