Trivializing headline and narrative, but read the article – Somerville should be a model for Boston once ImagineBoston 2030’s work is done

Somerville eyes zoning code to match its hip reputation

It’s turning out to be a long process, but what Somerville is proposing and will likely soon adopt is truly nothing less than a radical reform of the rules governing buildings and their uses. And our city should follow suit as soon as ImagineBoston 2030‘s work is done and we are ready to embark on the hard work that will be required to recast our zoning code in a way that fits the city we actually have and love already and the ways in which we want to make it better. I’ve personally blogged here about the fundamental mismatch between even our neighborhood’s relatively new zoning article and the real thing as it exists on the ground. But the graphic in the middle of the article that shows that there are exactly 22 out of Somerville’s almost 12,000 residential lots that are fully conforming to their current zoning code is mind-blowing.

Think about that for a minute — almost the entire urban fabric of Somerville’s existing residential neighborhoods is outlawed.

I very strongly suspect that the results would be almost identical in our neighborhood and you couldn’t build Roslindale or any neighborhood in Boston as it exists today by following the letter of the zoning that is currently in place. Speaking for myself, I love where I live and want the regulations that govern buildings and uses in my neighborhood to reflect a due respect for what we collectively have by making it the rule instead of the exception.

On the twin concepts of making connections and finding like-minded people

One of the more enjoyable aspects of being a part of WalkUP Roslindale has been in making connections to people who live and work in our neighborhood who are amazingly talented and incredibly generous. This has also been rewardingly true across this great city of ours. Case in point: This morning, I had the good fortune to have a little time to spend downtown at the temporary installation of an expanded sidewalk/pedestrian area on Franklin Street near Arch Street that will reportedly become permanent in the very near future. This will be a great improvement and provide a ready and (most importantly) local example for taking key locations of shockingly excess pavement and repurposing them for the enhanced street life that is begging only for a little encouragement to grow and blossom. (My loyal RTUF followers (all 3 of them!) will recall that I blogged over there about this very topic and location in early 2014.) The event also allowed me to connect with Erica Mattison, Dorchester resident and bike/walk advocate of the first order, and the Globe’s Dante Ramos. Dante’s piece is spot-on as usual: Pop-up plaza is a harbinger of streets to come (I hope).

And he even took the picture that Erica posted to her twitter account (your correspondent if on the far right of the photo). And, finally, my own photo taken near the start of the 3-hour installation period:

Resized

I would love suggestions in the comments on places in our own neighborhood where we think the city could productively repurpose excess pavement to better uses. Thanks!

3 observations about where we stand at Washington@Blue Ledge

  1. The "Double Threat"
    The So-Called “Double Threat”
    (image courtesy Federal Highway Administration)

    Not Random. The reconfiguration at Washington & Blue Ledge is part of the City of Boston’s ongoing effort to implement the Vision Zero Policy adopted about 18 months ago. Under this policy, which several cities have adopted around the US, our city has set a goal of reaching zero deaths among all users of our streets – drivers and passengers in motor vehicles, pedestrians, bicyclists, and others in alternative forms of wheeled/motorized transportation – by the year 2030. A major focus of the policy’s implementation is to respond to each crash involving serious injury or death by examining their location and making changes to improve safety. Washington@Blue Ledge is where Roslindale resident Silvia Acosta was killed by a speeding hit-and-run driver while in a crosswalk in mid-January of this year. The reconfiguration that is now under way seeks to reduce motor vehicle speeds and the so-called “double-threat” in the part of the crosswalk that crosses the northbound direction of Washington Street. Reducing vehicle speeds has a huge impact on whether pedestrians survive a motor vehicle crash — your chances of dying increase from

    Speed = Death
    Speed = Death
    (100 kph = 60mph; 50 kph = 30mph)
    (image courtesy Helsinki City Planning Department, see Slow Down Save Lives for details)

    under 10% at 20 mph, to over 50% at 30 mph, to over 80% at 40 mph. The double-threat is something I’m sure we’ve all experienced, where a crosswalk crosses two lanes in the same direction, the car in one lane stops, while the car in the second lane can’t see the pedestrian for whom the stop is being made, posits that they are stopping for no reason, and goes around them, hitting the pedestrian in the process. This is a big step forward for this intersection.

  2. Not Done. The reconfiguration at this location is not yet done. Boston PWD’s contractor should soon be installing (a) flex posts and bollards to delineate both the painted bump out on the southbound side and the pedestrian median, and (b) a push-button activated flashing beacon signal for the new crosswalk. Those of us who are focused on improving pedestrian and bicyclist safety in our neighborhood are intensely interested in this intersection and will be watching closely in the next few days to make sure these final actions are taken as soon as possible.
  3. Not Adjusted to Overnight. Observations have been made that the new configuration has not yet taken hold and some drivers are still using the new bike lane as if it remains a motor vehicle lane. While unfortunate, this is not surprising. The installation isn’t done yet, and the experience around town is that getting drivers to comply with new roadway configurations takes time and patience. If vehicle speeds are slowing as drivers adjust, see point 1, above. The intent is that the new configuration will reduce vehicle speeds permanently by narrowing the travel lanes and improving pedestrian and bicyclist safety.

Day 205 @ Washington-Blue Ledge: Just about fully installed!

Vision Zero BostonNo pictures yet, but I went by early this morning and the full reconfiguration/restriping of the intersection at Washington and Blue Ledge is now done. I believe the remaining items to be installed at this point are median strip signs indicating the new crosswalk and the flashing pedestrian sign. Many thanks to BTD/PWD, our municipal elected officials (especially District 5 City Councilor Tim McCarthy, City Council President Michelle Wu, and City Councilor Sal LaMattina, who chairs the Committee on Parks, Recreation, and Transportation that held a hearing on the Vision Zero program in May), and Mayor Walsh for getting this done. We should also recognize the advocacy around Vision Zero Boston generally from WalkBoston, Livable Streets, Boston Cyclists Union, and MassBike, among others. Lots, lots more to do to improve everyone’s safety on our streets all around this great city.

201 Days and Counting: An update on the rapid response at Washington & Blue Ledge

Smaller photo

We last reported on this important location a couple of weeks ago, when construction notices went up and we were eager to see the thoughtful plan that BTD had prepared become a reality. Now, as we hit 210 days and counting, we are still at the stage where nothing has happened within the street to physically address the crash that killed one of our neighbors. As you can see from the photo, the last two weeks brought wheelchair-accessible ramps at 2 corners where a new crosswalk is to go, and bases for the poles that will hold the crosswalk flashing beacon equipment. All of the construction signs and cones/barrels have been moved out and we are again wondering exactly how much longer this will have to wait. I asked this question of PWD on Friday via Twitter, and informed that their contractor “is scheduling remaining work” and they will “update when the schedule is available.” I think we can all agree that we hope the work is done very, very soon – in other words, in a matter of days. We are now well over six months since this tragedy occurred, and this response has been painfully slow in arriving.

4 Minutes for Walkability — What is it, how is it achieved, and what’s it good for?

If you have time to click on this link at grist:

The key to fighting climate change and mortality? Walkable cities.

read the intro, and then watch the short video — I believe that’s a 4 minute time commitment in total — you’ll find it worth your while. An excellent summary of what makes a place walkable, how it’s achieved, and what it’s good for. Enjoy and then get out there and get to it!

Counting down to rapid response improvements at Washington & Blue Ledge: 20 days to go to deadline

Nothing much further to say about this milepost. We’re down to 20 days to go what we understand is the deadline, and we’ve risen to 165 days since the crash. We remain hopeful that this response will happen when we’ve been told it will. It has been delayed far too long already.

148 Days and Counting — Waiting for action near Washington @ Blue Ledge

It is now 148 days since Roslindale resident Silvia Acosta was struck and killed by a hit-and-run driver while walking in a crosswalk near the intersection of Washington Street with Blue Ledge Avenue. To date, the city’s sole response has been to place a vehicle speed monitoring sign on the northbound side of the street. And that’s it, for what is supposed to be a high-profile Vision Zero “rapid response” project. WalkUP has been following this closely and we’ve heard many times that plans were close to final, that changes were imminent, and still nothing. How much longer does the city expect our neighborhood to wait for policy to turn into real action?

Celebrating new bicycle infrastructure in Roslindale!

IMAG0157

It took longer than it should have given the level of community support, but many community partners, starting with RVMS but including Street Ops, the offices of councilors McCarthy and Wu, Boston Transportation Department, the BSA Foundation, RozzieBikes, and your own WalkUP Rozzie, have finally succeeded in placing a bike corral next to the parklet at Fornax. The ribbon-cutting was yesterday and we had an excellent turnout. RVMS Executive Director Christina DiLisio made the point that several thousand dollars have been raised and is now available for more bike infrastructure in the square generally, so hopefully this is just a sign of much more to come.