Recap on WalkUP Roslindale Key Bus Stop Clearance Collaborative – Version 1.2

Overall, and no surprise to anyone, but there was a lot of snow out there this morning. The vehicular portions of streets were generally in good shape thanks to the city’s long-standing practice, so thanks go to the city’s own crews and their team of contractors responsible for plowing those areas. The sidewalks and the bus stops on them were another matter. The stops themselves on Hyde Park Avenue were in decent shape, though plowed in. At the other stops we cleared, the conditions at the start ranged from bad to horrendous. Clearly, more advocacy and work are needed to bring more attention and resources to clearing the walking and transit-related portions of streets — the sidewalks and bus stops — that are the city’s responsibility and enforcing the obligations of private property owners on the balance of our sidewalks. Plenty of folks we saw out this morning either walking or waiting for the bus were doing so in the cleared vehicular parts of the streets because the sidewalks and bus stop areas were unusable. This is hardly news if you’ve walked around Roslindale after a major snowfall. But it’s now 2018, combating the manifest impacts of climate change on this coastal city should be a top priority, and we need to move faster to encourage the shift to more walking and transit use that GoBoston 2030 is meant to promote. More needs to be done a lot faster.

So, my crew (Greg Tobin and yours truly) started the morning at Hyde Park Avenue and Cummins Highway. The first bus stop we hit was on Hyde Park Avenue going northbound:

 

Sidewalk was clear on the other side of this. Pretty good start.

Next, we confirmed Greg’s good shoveling out on Cummins going westbound before Hyde Park Avenue and on Hyde Park Avenue going southbound after Cummins:

Then things started to significantly deteriorate. We walked up Cummins from Hyde Park Av., over the bridge over the MBTA/Amtrak tracks (the sidewalks on the bridge were shoveled and treated – right to the presumed property line),  and dug out the 2 bus stops (east and west on Cummins) — neither of which or the sidewalks leading to them had been touched. Plowed in and completely unpassable, so the best we could do was create landing pads for the 2 stops:

 

We then made our way over to Roslindale Square to join Steve Gag and Rob Orthman and finish up their work at the major bus stop at Washington Street, heading northbound, at Cummins, in front of the Roslindale Community Center. When I passed by in the morning, the sidewalk had been partially shoveled but the shelter hadn’t been cleared and there was no way to access buses when they stopped – plowed in. Here we can see Steve and Greg working on clearing the corner and several shots of the cleared bus shelter and paths to board buses, and then below that, the cleared stop in front of the florist on South Street:

Finally, on the way home, I first walked up South Street and encountered a massive, sidewalk-blocking snow mound on South Street abutting the Village Market parking lot. Hopefully this has been cleared by now.

And then, to finish off the WURSC Collaborative 1.2, I dug out a landing pad for the stop where multiple buses come in at Robert/Belgrade/Corinth, on the same side as the commuter rail station. As can be seen from the photos, the sidewalk on Belgrade was completely plowed in and I can report that no clearing had occurred this evening. It is to be hoped that this sidewalk and bus stop will be cleared as soon as possible.