Go Boston 2030

Go Boston 2030 Idea Roundtable – Roslindale Session Thursday, Nov. 19, 2015 at Roslindale Community Center

Go Boston 2030RSVP here.

Earlier this year, Mayor Walsh announced Imagine Boston 2030, the first citywide planning process in 50 years. The Imagine Boston 2030 process is an opportunity and a framework for WalkUP Roslindale supporters to advance our vision of a walkable neighborhood and a walkable city where people of all ages will have ample convenient and safe options for getting around by foot, bicycle, and transit. The 2030 target date is far enough away that we could make substantial investments and improvements in that time frame, but close enough that we should be moving ideas into policy and policy into practice starting now. But it will only live up to its potential if residents speak up and engage in the process.

One important part of the Imagine Boston 2030 citywide effort is Go Boston 2030, “an initiative to envision a bold transportation future for the city.” Go Boston 2030 has been holding visioning meetings at various locations throughout the city, and the Rozzie session is set for Thursday of this week.

The Go Boston 2030 Idea Roundtables are designed to gather transportation project and policy ideas that would most affect our lives. By donating your ideas, you will contribute to planning a transportation future that works for everyone. It is important that those who share our vision of making Roslindale the most walkable neighborhood in Boston turn out and speak up. Details below:

Date: Thursday, November 19, 2015
Time: 6pm – 8:30pm
Location:

Roslindale Community Center
6 Cummins Hwy

Spread the word!

RSVP Link

Go Boston 2030 Roundtable Invite
Go Boston 2030 Roundtable Invite

Follow up on 874-878 South Street — Installment 1 — Pre-filing community meeting

Summary

Monday’s initial pre-filing community meeting on this proposed project — as yet unnamed — is now in the books. LANA board members observed more than once that the turnout was much heavier than is typical for their summer meetings. Almost everyone (other than the LANA board and a further exception that I will discuss below) was there for this project, expressing responses ranging from approval to rejection and qualifying questions/statements in between. Renderings of the project as presented at the meeting are not available electronically. If they do become available, I will update this post.

Generally speaking, if done right, this is the right kind of project for this location and should win support from those connected with WalkUP Roslindale. It is an easy walk from the site to the Roslindale Village commuter rail station and the square with its super market/bakeries/specialty food stores/restaurants, etc., and excellent bus connections into the Orange Line at Forest Hills. After several decades of decline or stasis, Boston’s population is growing again and we need more housing units to accommodate those who want to come here. We should welcome this opportunity to both do our part for our city and to bring more people close to the center of our community and support our main business district. This is not to say that there are concerns here — they are discussed below. But my own strong inclination is to support this proposal and encourage its improvement through the upcoming small project review/zoning relief process.

The Project as Proposed

Boiled down to basics:

  • Project site is located in the LC (Local Convenience) subdistrict of the Roslindale Neighborhood District (Article 67 of the Boston Zoning Code)
  • Demolition of the existing 4 storefronts and 2-family residential at the rear
  • All existing tenants (commercial and residential) are at-will/month-to-month
  • 15 off-street parking spaces at the ground/first story level
  • 15 residential condominium units on 3 levels above (all units are 2BR/2BA, approx. 1000 square feet (SF) in area)
  • Vehicular access would be over the existing curb cut and along the existing driveway from South Street at Walter Street
  • There would be no commercial space in the project as proposed
  • Two units would be required to be affordable per the city’s inclusionary zoning policy
  • Project will undergo Boston Redevelopoment Authority (BRA) Small Project Review (for projects 15 units or more but not considered a large project — entails design review of the project)
  • Variances required from the Boston Board of Appeal (per my notes) for this proposal are for Floor Area Ratio (FAR) (ratio of building size to lot area) (approx. 2.5 vs. 0.5 allowed), building height and stories (40’8″ vs. 35′ and 4 vs. 2 1/2), side yard width (5′ v. 10′ (abutting residential subdistrict width of 10′ applies)), and parking spaces per unit (1 per unit as opposed to 2 per unit for market rate and 1.5 per unit for affordable in a project of this size)

Concerns Raised

A fairly typical range of concerns was raised at the meeting, including urban design/architectural style (flat roof, flat front, not much detailing shown), height and bulk of the structure, affordability of the market rate units and whether additional affordable units can be provided beyond the two required, potential parking impacts (raised principally by those who appeared opposed to the project, with the assertion being that despite the transit-oriented and walkable location, there would be more than 1 car per unit, so the overflow parking would have to occur on on-street parking spaces that are perceived to be scarce; there was disagreement with this perception from a number of speakers at the meeting), and how much support there was for non-auto modes of travel (e.g., bicycle parking).  I personally raised the issue of the proposed elimination of commercial space at this location, but got almost no support in the room and a response from the developer/property owner that commercial really doesn’t work at this location (I acknowledge it has been limping along for the entire time I’ve lived here, though I think a single storefront or perhaps even a live/work unit or two should still be considered).

An additional concern raised in opposition to the project was that the LC zoning from which so many variances would be required is part of a neighborhood-wide Roslindale strategic planning/rezoning effort that was completed in 2007. Accordingly, to paraphrase how the argument went, there should be no deviating from that zoning because it reflects the neighborhood’s established preference, which was, it is said, to (1) preserve the existing density and character of this LC subdistrict and, more importantly, the surrounding 2F-5000 (“Two Family-5000 Square Feet”) residential subdistrict, and (2) channel development like this project to the commercial district in Roslindale Square. This specific point was raised from the outset by Wayne Beitler during the LANA Board’s Q&A and then by Carter Wilkie in the open discussion. This is not surprising, since both Wayne and Carter were members of the advisory committee that worked with the BRA on the rezoning a decade ago. While I appreciate the hard work they did on that committee and what they have both done generally to make Roslindale a better place, it is time we had a frank discussion about what our current zoning does and does not do, and how it needs to change for the better through the upcoming Imagine Boston 2030 planning process.

The Fundamental Disconnect of Our Current Zoning

Focusing first on the 2F-5000 residential subdistrict in which all of the Longfellow Area except the LC subdistrict has been zoned, it is critical to realize that “2F-5000” is itself a misnomer. When you look at the dimensional table for this subdistrict under Article 67 (the Roslindale Neighborhood Article), it’s actually a minimum of 5000 square feet (SF) in lot size for the first dwelling unit, and then a further 3000 SF for the second unit. So, it’s really a “1F-5000/2F-8000” zone. Now, consider for a moment that the most common lot size in the neighborhood is actually closer to 4500-4800 SF in area. For example, the lot for my single-family house is 4600 SF in area, and the lot sizes for the existing 2 families on my street are 4900 SF, 4340 SF, 5150 SF, and 4600 SF. In other words, the zoning that was adopted in 2007 means the majority of us are non-conforming at the most basic level.

This is not insignificant since any infill development (think of the scattered “double-lots,” many of which don’t meet the 5000 SF threshold) would have to meet this ill-fitting standard, and non-conformity applies also to additional dimensional aspects of the typical developed lot in the neighborhood, such as side yard widths (required to be 10 feet on both sides for detached structures – my house and every house on my block has at least one side yard that is narrower than 10 feet – most houses in the subdistrict do), rear yard setbacks, FAR, you pretty much name it. In addition, the parking requirement is 2 off-street spaces per unit throughout the entire Roslindale district (not just the 2F-5000 zone), with only limited exceptions right in Roslindale Square and for affordable units. I have a single space on my lot. Several of my neighbors have 1 space or no spaces at all. Overall, then, the zoning for our neighborhood, ostensibly meant to “preserve” us, actually treats us, with few exceptions, as legally not within the vision of what the neighborhood “should” be. In practice, this means that the existing zoning requires almost any change in the neighborhood’s built environment to go through the zoning relief process.

An object lesson in exactly this issue was in fact given at Monday night’s meeting. The first item on the agenda was a single-family home owner on Walter Street who was before LANA to seek support (or at least non-opposition) for his proposal to add a dormer to the upper story of his house to allow for a second full bathroom. He needed relief because the existing house, which appeared to be similar to almost every other house in the Longfellow Area, is non-conforming and the dormer would exacerbate that non-conformity. Thankfully for him, he appears to get along well enough with his immediate neighbors that this small change is not an issue. But the question has to be asked as to what kind of land use regulatory system would routinely require this level of process for such a small change?

The same mismatch of the current zoning with existing use and development, let alone what we might want, occurs in the LC subdistrict in which the South Street project is proposed to be located. The most obvious mismatch is the 0.5 FAR, with which I suspect none of the properties currently comply and which, if it were really to be complied with, represents a fundamentally dispersed, low-density suburban vision for this area. Furthermore, if the saving proposition of the rezoning was supposed to be that Roslindale Square was rezoned to accept more development, that didn’t actually happen. The two projects that have been done – the 3-story commercial building that replaced the old abandoned gas station, and the substation/funeral home redevelopment – both required zoning relief in the form of variances. In other words, the zoning for the square was so good that it had to be varied from to do two projects that the community wanted. Should they also have been told that the zoning was relatively new and they would have to live with it?

To summarize, we have what amounts to “zoning by variance” and it has been quite effective at slowing the pace of change. That may have worked in a period when Boston’s population was declining or remaining flat. It does not and cannot work when population is increasing, as it is today and appears poised to do for the foreseeable future. This is why the Mayor’s housing plan is so important to support and why Imagine Boston 2030, the citywide planning process that is just now getting going, is to important. We can no longer afford to treat any part of Roslindale as totally off limits to change, as if there were a growth boundary around the square and that is it. The square is great, but it can be better for everyone, and it won’t be better unless we welcome new neighbors within walking distance of its amenities.

What comes next?

I would expect that the developer/owner comes back to a further pre-filing meeting, whether it’s before LANA again or in a stand-alone format. If they’re willing to do that and show they’re listening by making improvements to their proposal, that would go a long way toward securing the support they’ll need. If they don’t, they’ll still be coming back to the neighborhood for their small project/zoning relief public meeting(s) and we will see what they’ve heard and not heard. Beyond that, everyone connected with WalkUP Roslindale needs to pay as much attention as we can to the Imagine Boston 2030 process when it gets rolling. We can’t let the opportunity to break out of the “zoning by variance” bind pass us by.

Imagine Boston 2030 – Brief Public Involvement Survey

Seems worth checking out this very brief survey on means and methods of public involvement over on the Imagine Boston website. If we want a better Boston (including Roslindale), we need to speak up and be heard when the city asks for our participation and ideas, and we might as well start at the beginning.